Analisa Overhaul Aliran Beban PMT GI 150/70 kV Menggunakan ETAP pada SUTT 70 kV

Authors

  • Agus Siswanto Universitas 17 Agustus 1945 Cirebon
  • Mudofar Baehaqi Universitas 17 Agustus 1945 Cirebon
  • Mansur Naufal Universitas Halu Oleo Kendari

DOI:

https://doi.org/10.32492/nucleus.v3i2.3202

Keywords:

PMT, Overhaul, Testing, ETAP simulation

Abstract

The power breaker (PMT) in the transmission system functions as a load breaker both under normal circumstances and when a disturbance occurs. In July 2021 it was discovered that there was an SF6 gas leak at (PMT) bay Arjawinangun 2 at Gi Sunyaragi. Under these conditions an overhaul was carried out which in the implementation found several sources of causes of leaks such as scale and corrosion at the joints and packing conditions that were no longer flexible. Before the implementation and after the implementation of the overhoul, tests were carried out including: contact resistance testing, insulation resistance testing and after a series of tests were carried out, then an analysis of the test results was carried out and a voltage drop simulation was carried out using the Etap 12.6 software from a series of activities, 5 simulation results were obtained and concluded that the system is still within safe limits (up 5%, down 10% from the nominal voltage). As well as other tests such as isolation resistance and contact resistance are still included in the specified standard category, so it is concluded that the PMT bay Arjawinangun 2 is in good condition and safe to operate.

References

Silaban, Mathew March Kreshna. 2017. Pengujian hambatan kontak pada pemutus tenaga (PMT) bay SUTT 70kV di gardu induk Sunyaragi. Yogyakarta : Universitas Gajah Mada.

Rudi salman, “Simulasi dan Analisis Aliran Daya Pada Sistem Tenaga Listrik Menggunakan Perangkat Lunak Elektrical Transient Analyser Program (Etap) Versi 4.0.”

Adib Gustian Nigara & Yohanes Primadiyono, “Analisis Aliran Daya Sistem Tenaga Listrik Pada Bagian Texturizing Di PT Asia Pasific Fibers Tbk Kendal Menggunakan Software ETAP Power Station 4.0” Tek. Elektro, vol. 7, no. 1, pp. 2-5, 2015.

Kurnia, indrawan. 2018. “ Analisis system aliran daya kelistrikan pada PT.PLN (Persero) Unit Pembantu Sektor Medan Titi Kuning menggunakan Software ETAP.”

Yuli Asmi, R., A. Bayu Adrian, S. Agus and M. Nurul Maghfiroh (2020). "Analysis of Lightning Disruption Reduction in HVAD Tower 70 kV Parallel Inductance Grounding using NA2XSY Cable in West Java." INTEK: Jurnal Penelitian(Vol 7, No 1 (2020): April 2020): 18-25.

YULI ASMI RAHMAN, M. P., RIZANA FAUZI, AGUS and SISWANTO (2022). "Performansi Grid Tie Inverter dengan Variasi Pembebanan pada PV-on Grid Module Trainer." ELKOMIKA: Jurnal Teknik Energi Elektrik, Teknik Telekomunikasi, & Teknik Elektronika Vol. 10(2): 287-296.

Agus Siswanto, R. A., Erfan Subyanta ( 2021). "ANALISIS KINERJA PMS REL 2 BAY TRAFO 6 MENGGUNAKAN THERMOVISION METHODE DI GARDU INDUK SUNYARAGI." Jurnal Ilmiah Foristek 11: 47-43.

Ashad, B. A., I. C. Gunadin, A. Siswanto and Yusran (2018). Early Warning Condition Transient Stability on South Sulawesi System using Extreme Learning Machine. 2018 2nd East Indonesia Conference on Computer and Information Technology (EIConCIT).

Gunadin, I. C., Z. Muslimin and A. Siswanto (2017). Transient stability improvement using allocation power generation methods based on moment inertia. 2017 International Conference on Electrical Engineering and Informatics (ICELTICs).

Gunadin, I. C., Safrizal, M. Rosyadi, A. Siswanto, Syukriyadin, Z. Muslimin and Gassing (2020). Wind Speed Prediction in the area of PLTB Tolo Jeneponto South Sulawesi using Artificial Neural Network. 2020 1st International Conference on Information Technology, Advanced Mechanical and Electrical Engineering (ICITAMEE).

Rosyadi, M., A. Siswanto and R. Irmawanto (2022). Comparison Analysis of Virtual Inertia Control Methods for Smoothing Power Production of Grid Connected Wind Farm on a Power System. 2022 International Conference on Electrical Engineering and Informatics (ICELTICs).

Siswanto, A., A. Sumardiono and E. Prihastuty (2018). Design Fuzzy Logic Controller PSS (Power System Stabilizer) to Stability Improvement of Wind Turbine Penetrated on South Sulawesi Transmission System.